Highways (Financing) Bill (First sitting)
<strong>Q</strong><strong><QNum HRSContentId="{90FD0593-C812-4DBF-8709-0DF25C670BCB}"> </QNum></strong> It is a pleasure to serve under your chairmanship, Ms Lewell. I have two questions. First, the Bill looks specifically at the crossing, but there are other infrastructure upgrades—as an MP in north Kent, my example is the A229 Blue Bell Hill upgrade. There are key junctions where congestion is a problem. In your view, does the Bill take into account the other, wider infrastructure upgrades that might be necessary? Secondly, this week, the Public Accounts Committee, which I sit on, released a report on the RAB model for Sizewell, which there are concerns about. Do you have a view on that model? I appreciate that you have indicated that the model will not be used elsewhere, but is there an educated view on whether an alternative model might have worked better? <em><strong>Steve Gooding:</strong></em> On the first point, the Bill is not specific even to the Dartford crossing or the lower Thames crossing, so I do not think that it takes account of the other schemes we have talked about per se, other than in the general duty for the Secretary of State and ORR to consider the network as a whole. That has already been raised, but the Committee might want to probe it a bit further. As for the RAB model, I can certainly see the logic, but one has to start with a decision that the Chancellor does not wish to borrow the money himself. If that is the case, in these circumstances, given where National Highways has got to already with contracting for the construction of the tunnel, this appears to be a sensible <span id="11" class="column-number" data-column-number="11"></span>model, provided that lessons are learnt from past RAB projects. One of those is about the ability and capability of the regulator to do what it is being relied on to do. <em><strong>Edmund King:</strong></em> One of the features of the RAB model that is quite hard to get your head around is that it is open ended. There is no finish date. On the M6 toll I know that it is a different private finance model, but it was given a 53-year concession. Under this model, in effect, the concession could be 100 or 120 years unless the licence is revoked. That is quite difficult to get your head around at first, because when you look at the Dartford crossing and the tolls going to the Treasury, this is totally changing the model. We have to be sure that the safeguards are there and built into the model. That is why I think toughening up and strengthening the Office of Rail and Road and bringing in a greater degree of independence is increasingly vital.